Provincial rule: New Brunswick requires a licensed installer to submit the application for installation, construction, repair or replacement. Provincial inspection and approval are required before work proceeds and again before the system is covered.
Open provincial / regional onsite-wastewater authority → Municipal sewer/records check for this address
Moncton Engineering identifies water and sewer connections under its roadwork and utilities permit requests, to be made before work. Contact Engineering about municipal lateral records and connection eligibility for the parcel. This municipal utility process is separate from New Brunswick on-site sewage-disposal approvals.
Direct city authority: Municipal utility and water/sewer-connection permits
Source reviewed October 14, 2026. This check does not determine the sewer status of any individual lot or authorize an onsite system; confirm with the municipality and provincial/regional environment authority.
Source limit for this city. The city service/connection authority below has been verified, but it is not a septic permit authority. For onsite work, follow the provincial guide and verify the exact parcel’s existing sewage-disposal records.
Read the New Brunswick approval guide → Who approves septic work around Moncton?
New Brunswick’s provincial on-site sewage program is the regulatory anchor. Where municipal sewer is unavailable, building-permit packages may require proof of provincial approval before the local permit can proceed.
Confirm who holds the onsite sewage approval, whether a provincial certificate/approval is required for the proposed work, and whether the municipality needs that approval before issuing a building or development permit.
Moncton local-route status: A specific city sewer or connection process is now cited. It establishes a useful service inquiry route, not a property-specific onsite-system authorization.
Official sources for this guide
If sewage is backing up or surfacing, stop using affected fixtures and contact a qualified professional or the responsible authority. Never enter a septic tank.
Official authority route
Municipal source above checked October 14, 2026 for a wastewater connection or property-record enquiry. The provincial/regional source controls onsite wastewater permitting. Recheck updates and lot-level facts before relying on this guide.