Richmond: two records for two different wastewater routes
Richmond operates a sanitary sewer network with mains and pump stations, while Vancouver Coastal Health handles filings for qualifying onsite sewerage systems in its service area. If a Richmond property is said to be septic, check the City’s actual connection record rather than assuming that an old tank or listing description proves current service. If the lot remains onsite, request the VCH filing and certification history, and compare its site plan with current landscaping and access.
For a new connection to Richmond’s sanitary system, the City’s sewer-connection bylaw requires an owner to apply before installation. That is distinct from an authorized person’s health-authority filing for construction or alteration of an onsite system. A proposed addition should therefore identify its service route before a drainage design is prepared. The VCH onsite guidance is the regulatory starting point for an unsewered parcel; the City’s sewer section is the starting point for municipal connection and infrastructure questions.
Who approves septic work around Richmond?
British Columbia’s Sewerage System Regulation uses an Authorized Person model. For typical residential systems, an Authorized Person files the required system information with the regional health authority and later files certification after construction.
For records, ask for the filing/record of sewerage system, site plan or as-built information, and any letter/certification on file. The municipality may control building or zoning issues, but the regional health authority is the key onsite-sewerage records route.
Official sources for this guide
Official authority route
- BC Sewerage System RegulationProvincial · topic-specific
- Vancouver Coastal Health — Richmond-area sewerage systemsLocal authority · relevant official route