Port Moody — Property Information Portal and utility records: verified authority and records path
Port Moody’s Property Information Portal provides a city-specific route to review property utility details and building application activity. Portal results may be incomplete and utility-account records alone do not definitively establish buried system type.
The City’s wastewater collection system page describes municipal and private sewer-pipe responsibilities. If a lot actually has an onsite system, confirm the applicable B.C. health authority filing or system records under the Sewerage System Regulation; do not mistake municipal utility history for onsite approval.
Who approves onsite work near Port Moody?
Start with the provincial framework, then establish the exact regulator for the parcel in Tri-Cities / Burrard Inlet. The responsible office may differ from the office that handles municipal water or sewer accounts. Confirm the authority before paying an application fee or starting excavation.
Records to request before purchase or renovation
- Property sewer-service confirmation and applicable utility account details.
- Available as-built site plan, past system permit or filing, inspections and commissioning paperwork.
- Pump-out, service and maintenance records, plus details of any expansions or reported failures.
- Site constraints: wells, slopes, flood-prone ground, shoreline setbacks and access for repairs.
When to seek a qualified professional
A design-capacity change, a new dwelling, significant repair, wastewater discharge problem or unknown tank condition can require professional site review and regulator contact. Never enter a septic tank. Stop using affected plumbing if sewage is escaping and obtain qualified assistance.
Official sources
Regulation and municipal starting points
- B.C. Sewerage System Regulation — provincial framework
- Port Moody — Property Information Portal and utility records — service and records starting point, not a verified onsite permit office