New Westminster: verified service and approval steps (October 2026)
The City states that connection length/location information for a plumber may be obtained from Engineering and Public Works during business hours. The city also documents sewer service maintenance responsibility and disconnection on demolition; those are not septic-system permits.
Next step: Ask New Westminster Engineering for the parcel’s sewer service record and whether an active connection is recorded. If an onsite system is claimed, request prior records from Fraser Health and confirm the next steps with an Authorized Person.
Direct research sources
Who approves septic work around New Westminster?
British Columbia’s Sewerage System Regulation uses an Authorized Person model. For typical residential systems, an Authorized Person files the required system information with the regional health authority and later files certification after construction.
For records, ask for the filing/record of sewerage system, site plan or as-built information, and any letter/certification on file. The municipality may control building or zoning issues, but the regional health authority is the key onsite-sewerage records route.
Official sources for this guide
Start with these official sources
- BC Sewerage System RegulationProvincial · topic-specific
- Fraser Health — onsite sewerage systemsHealth authority · topic-specific
- New Westminster homeowner sewer service and recordsMunicipal / regulator · evidence checked
- New Westminster demolition and sewer disconnection procedureMunicipal / regulator · evidence checked