Markham’s ePLAN and installer information
Markham’s building-permit guide identifies Schedule 2, Sewage System Installer Information, for projects with private onsite sewage systems. The guide also points applicants to ePLAN for electronic submissions. If a seller provides a drawing but no installer or approval record, ask Building Services what the property file contains; the drawing may describe a proposal rather than the system that was finally installed.
For a home expansion, the practical question is whether the existing private system was designed for the new wastewater load and whether construction will intrude on the treatment or replacement area. Have the designer put that answer into the permit package, along with the correct Schedule 2 details where applicable. The Markham guide is a document checklist, not a parcel-specific statement that the lot is on septic. Check water/sewer service records first, then ask the City which system drawings and site evaluation it requires for the actual work.
Markham — guide to building permits →
Markham’s current building-permit guide lists onsite sewage system drawings and details plus a Statement of Design for properties served by a private system. It also identifies Schedule 2 installer information for applicable private onsite projects. For additions and secondary-unit work, this means the wastewater system is not just a note in the margin: the private-system design belongs in the coordinated permit package and should be checked against the proposed building footprint and use.
Markham expects the onsite design to appear in the building package
Who approves septic work around Markham?
Ontario regulates most residential onsite sewage systems under Part 8 of the Building Code. Systems with a daily design flow of 10,000 litres or less are generally administered by a municipality, health unit or conservation authority; larger systems fall under the environmental approval regime.
Confirm the exact Part 8 authority before applying. New systems, replacements, major repairs, additions or changes that increase design flow can require permit review, site/soil information, design calculations and inspections before covering.
Official sources for this guide
Start with these official sources
- Ontario sewage self-assessmentProvincial · topic-specific
- Markham — guide to building permitsLocal authority · relevant official route